Important Visitor Information

There are currently ongoing roadworks on Hollingbourne Hill, south of the railway. There is a short diversion in place which takes a small single track road. This diversion is very narrow and the surface is poor. Access from the A249 via the M2 or Detling Hill or Sittingbourne both via Bredgar Village are unaffected. We strongly recommend coming in from the A249 near the M2 junction (just Maidstone side of the roundabout. Through Oad Street and into Bredgar then towards Hollingbourne. Before you reach the Railway there are signs “NO HGV’s”. Go passed these signs as the roadworks are after the railway. Any vehicle passing these signs will reach the railway