Zambezi is still on bocks with the rear suspension in pieces. We have however machined new parts and located a spring that should give us a better ride. In addition we have freed up the blocked oiling holes in the bearings. All in all – the unexpected maintenance is going well.

Fowler Zambezi rear suspension overhaul – Progress
Posted in Uncategorized.
