Fowler Zambezi rear suspension overhaul – Progress

Zambezi is still on bocks with the rear suspension in pieces.  We have however machined new parts and located a spring that should give us a better ride.  In addition we have freed up the blocked oiling holes in the bearings.  All in all – the unexpected maintenance is going well.

Posted in Uncategorized.

Leave a Reply

Your email address will not be published. Required fields are marked *