Those of you who noticed Helga's boiler was outside the loco shed, this was to enable us to do a couple of light steamings.
Also to check all was well with the few jobs that had been completed before reuniting it with the rest of the loco.
The job of lifting the boiler in is so much easier with the JCB, having fine control during the process means that we completed if before lunch.
Reattaching all the other bits will take some time, but at least we can see an end to the work, with the hope of steaming her before Christmas.