Volunteers replace 40 sleepers during 3 track days in March 2025

A detailed track inspection over the winter identified 40 sleepers that needed replacement.  Volunteers selected the first 3 Thursdays in March and worked hard to replace them all.  This included lifting 2 lengths of track and replacing most of the sleepers plus a number of single ones.  Normally we pull them out but many just […]

Continue reading

Fire truck in checking and inspection

Our US fire ladder truck has a number of bookings in 2025 and to be ready for the season it is in for checking.  The ladder cables needed adjusting and during inspection we noted that 2 pullies were worn.  Not an off the shelf item so we have made them from scratch.  Now refitted and […]

Continue reading

Locomotive Katie in final stages of a 2 year overhaul.

No.2 ‘Katie‘ is an 0-6-0 well tank built by Arn Jung of Jungenthal, Germany, in 1931 (works number 3872) has been in our workshops for over 2 years being completely overhauled.  Cab floor replaced, well tank top renewed, many overhauled valves and components, but we are in the final stages of getting this loved little […]

Continue reading

Various boiler doors overhauled

During the winter it is time for all our steam boilers to get inspected and checked.  The boiler doors – access points into the boilers barrel – are removed, cleaned and painted.  The boiler is inspected by an independent engineer in assuming all is OK, new seals are fitted and the doors reinstalled.  The boiler […]

Continue reading

Carriage Roof Replaced with traditional hessian

Restoration of an Old Railway Carriage Work on the centre balcony coach continues.  Many thanks for donations of oil based paint – we still need more – anyone would think we’d covered the roof with a sponge!!!  The roof should be finished in the next week or so and we are now working on refurbishing the […]

Continue reading

Brouhot Portable has all tubes removed.

We have now removed all the tubes in this portable engine.   The new tubes are on order (thanks to a donation to cover the cost – you know who you are – much appreciated).  We don’t expect them to be delivered until January so work will progress after the Christmas events to have the boiler […]

Continue reading

Locomotive Katie gets boiler refitted.

Work on our Arn Jung Locomotive (works No. 3872) Katie is progressing well.  The running gear is now nearly complete, the couplings are back on and the brakes are reconnected.  The boiler has had an initial warmup steam – first for over 2 years in October.  The subsequent full steam test went well now the […]

Continue reading

October ’24 Newsletter

After a very busy Summer we are moving into the final months of 2024.  We have a couple of autumn activities still to take place – Halloween diesels next week and then we are hosting Father Christmas for the first two weekends in December.  After that it will be into the hard work of maintenance […]

Continue reading