Those of you who noticed Helga’s boiler was outside the loco shed, this was to enable us to do a couple of light steamings. Also to check all was well with the few jobs that had been completed before reuniting it with the rest of the loco. The job of lifting the boiler in is […]
Continue readingWorkshop update 22 June
This week work continues on Helga’s boiler. After a few light steaming sessions the boiler is settling down, some of the fittings had a bit of attention to stop a few drips. We pumped the boiler up hydraulically and it was gratifying when she held pressure, one step closer to the hydraulic test. We have […]
Continue readingWorkshop update 15 June
The last couple of weeks have been busy around the workshop after the June open day. Firstly the cleaning of the locos and doing any maintenance jobs on them, with only one small issue with one of Eigiau’s injectors, which was tracked down to the clack valve seat not sealing correctly. After doing the the […]
Continue readingWorkshop update 12 May
Today was mostly outside work as it was a lovely day. We prepared the works train which will be needed for some more track maintenance. Loco cleaning continues with attention paid to all those hard to get at greasy bits. Inside the shed Helga’s boiler is now on the trailer and has had the new […]
Continue readingWorkshop update 27 April
More preparations for this Sunday’s open day today with lots of happy workers, Bobby was happy just lying in the sun.
Continue readingWorkshop update 20 April
One of the most important days in the railway’s calendar is the visit from the Boiler Inspector for steam testing. Today we tested 6 boilers which all passed. Another important area is the office, which as you can see has very happy staff. We couldn’t resist a run down the line with Victory to do […]
Continue readingWorkshop update 14 April
We managed to get a small team together to perform sleeper replacement duties today in readiness for our first Open Day of the year. Jenny took on the roll of works train loco.
Continue readingWorkshop update 13 April
This week we did the final preparations on the locos prior to the steam testing which is not far away, this involved quite a bit of shunting the shed around, and coaling them up. The portable engine was steamed today suitably guarded by its driver, with Bobby looking on from the undergrowth.
Continue readingWorkshop update 6 April
Although it was very cold today we steamed the Garrett again to check the work we did last week, all was well so we had a little run around the top field a couple of times just to check the drive bearings. Some refurbished parts have been reattached to Helga’s boiler. A new bit of […]
Continue readingWorkshop update 30 March
This week on the Garrett traction engine the cylinder cladding was reattached, it was certainly worth the effort to repaint and line it out, it looks very smart. Other jobs from last week’s steaming was to redo a couple of the gaskets and fix some of the smaller pipe runs. On-going jobs are Helga’s boiler […]
Continue reading